SAMORE Project Planning
Planning Service:
o Planning is considered as an important contractual document for future claims,
arbitrations & disputes.
o The professional & logic schedule can protect your company against any un- fair
performance by the consultant party during work progress
o The expert & dynamic planning services will surly save your cost by getting the
maximum benefits of using your available resources and accurate follow ups.
o The rapid approval of the master CPM schedule is the best benefit for you to
confirm the project baseline at the early stages of the project
o The long-term project success based on the accurate and full site progress data
collection, then the analysis of this data, and the experience of using (what if
scenario techniques)
o Prepare or modify the project CPM target master schedule as per contract
requirements
o Determine and Customize the project locations, Zones and levels to estimate the
optimum time and resources integration, to achieve the ideal solutions for work
plan, and resources movement during project period
o Considering all related authorities’ procedures, through all contract phases
o Design quality control plan that comply with contract specifications
o Prepare quality assurance plan as per contract statements
o Obtain safety plan as per contract requirements
o Adjust the schedule as per our client suitable circumstances, and expected local
construction environment risks, to gain and maximize benefits, versa, to minimize
risks for our Client.
Monthly Progress updates & weekly follow-up efforts:
o Monthly CPM update reports
o Two weeks ahead Schedule
o Triggers for the delayed activities
o Triggers for the delayed drawing submittals
SAMORE: Mob: +965-66259917, Email: SAMORE2021@gmail.com Page 1 of 9SAMORE MUHENDISLIK INŞAAT TARIM SANAYI VE TIÇARET LIMITED ŞİRKET.
Metal Trade: Rail ways – Billets – Rebar-Coils Oil Trading: Diesel – Jet.A1
Trade: Rail ways – Billets – Rebar-Coils Oil Trading: Diesel – Jet.A1
o Triggers for pending drawing Approvals
o Triggers for the delayed Material submittals
o Triggers for pending Material Approvals
o Attention for the delayed Material procurement (order-manufacture-shipping-
customer service release-arrival to site)
o Control site format performance in detail
Technical Support Department:
o Design Review & Shop drawings & composite services drawings
o Starting with site coordinates, and comparing with the design drawings
o Check & colligate the project axis for all drawings
o Determining all the conflicts at an early stage of the project
o Perform high quality shop drawing details as a manual of work executing as well
as the high quality & approved shop drawings
o Express and applicable composite drawings to avoid rework and costly problem
solutions
o Prepare the drawing submittal list schedule
o Study the drawings in conjunction with all contract documents
o Prepare RFI’s (request for information) giving enough time before submittals to
save time and
o efforts, depending on the contract documents priorities
o Perform the shop drawing as per the above introduction statements
o Submit of the shop drawing to the consultant
o Follow up the submittals with consultant to get approvals
o Attend all technical meetings concerning shop drawing or RFI’s
o Attend Site Progress Meetings
o Applying highly professional Utility systems for composite services drawing
coordination and production
SAMORE: Mob: +965-66259917, Email: SAMORE2021@gmail.com Page 2 of 9SAMORE MUHENDISLIK INŞAAT TARIM SANAYI VE TIÇARET LIMITED ŞİRKET.
Metal Trade: Rail ways – Billets – Rebar-Coils Oil Trading: Diesel – Jet.A1
Trade: Rail ways – Billets – Rebar-Coils Oil Trading: Diesel – Jet.A1
o Prepare the Final as-built drawings
SAMORE Planning Scope of work
Target CPM schedule
o Prepare or modify the project CPM target master schedule as per contract
requirements
o Determine and Customize the project locations, Zones and levels to estimate the
optimum time and recourses integration, to achieve the ideal solutions for work
plan, and resources movement during project period
o Considering all related authorities’ procedures, through all contract phases
o Design quality control plan that comply with contract specifications
o Prepare quality assurance plan as per contract statements
o Obtain safety plan as per contract requirements
o Adjust the schedule as per our client suitable circumstances, and expected local
o construction environment risks, to gain and maximize benefits ,versa, to minimize
risks for our client
Monthly Progress updates & weekly follow up efforts
o Monthly CPM update reports
o Two weeks ahead Schedule
o Attention for the delayed activities
o Attention for the delayed drawing submittals
o Attention for pending drawing Approvals
o Attention for the delayed Material submittals
o Attention for pending Material Approvals
o Attention for the delayed Material procurement (order-manufacture-shipping-
customer service release-arrival to site)
o Control site format performance in details